NAU Potter’s Square

NAU Potter’s Square

What was once an unused dirt lot enclosed by the horseshoe of Prochnow Auditorium and the 1899 Bar & Grill is now outdoor patio seating with a fire pit, a central lawn for ceremonies and tented events, and a formal central lighted walkway.  Peak Engineering led the design team and provided construction phase services.

NAU Central Campus Pedway

NAU Central Campus Pedway

Peak Engineering led a design team of landscape architects, structural and electrical engineers on renovation of the central campus pedestrian and bicycle corridor and repurposing of two parking areas.  The completed project improved accessibility, incorporated universal design strategies and created recreational green space and gathering areas.

Cromer Elementary School

Cromer Elementary School

Peak Engineering evaluated existing parking and traffic conditions, prepared alternatives, solicited input from the PTO & Site Council and redesigned the drop-off and sidewalk areas in front of the school to improve safety and circulation.

Flagstaff West St & Arrowhead Ave

Flagstaff West St & Arrowhead Ave

Peak Engineering is prime consultant for the mile-long reconstruction of West St & Arrowhead Ave.  Phase 1 construction was completed Fall of 2012, Phase 2 is scheduled for construction in Summer 2013. The scope of work includes new roadway, bike lanes, curb and gutter, sidewalks, driveways, ADA curb ramps, stormdrain, water main and services, sewer services, a pedestrian signal, a mini-round-about and street lighting.

Sedona Skate Park Survey

The City of Sedona asked Peak Engineering to coordinate the upgrade of the City’s skate park to accommodate BMX users.  In addition to seeking out a BMX and Skate Park design specialist, Peak Engineering performed the topographic survey.

Flagstaff Urban Trail System- Sego Lily

Flagstaff Urban Trail System- Sego Lily

The project is a mile-long trail extending from the Sunnyside Neighborhood to the Arizona Trail on McMillan Mesa.  The trail was designed to follow along the edge of the mesa and take advantage of the natural features including rock outcrops, mature Ponderosa and oak groves. Construction on this project was completed Fall of 2012.

 

Northern Arizona University: Greening the Quad

The project was a major revitalization of the historic North Quad.  Formerly a parking lot and roadway, the North Quad is now an iconic place on campus for events, academic ceremonies and a gathering space for the community.   Peak Engineering led the design team and was responsible for survey, design, public support and construction phase services.

Flagstaff Urban Trail System- Hospital Rim

Flagstaff Urban Trail System- Hospital Rim

Peak Engineering is completed the design phase of the Hospital Rim Trail segment of the Flagstaff Urban Trail System (FUTS).  Once constructed, the Hospital Rim FUTS will connect Beaver Street with Highway 180.

 

 

NAU Health & Learning Center*

NAU Health & Learning Center*

[ Construction Underway ]

The project scope for civil engineering included utility design, relocation and demolition; stormwater analysis and stormdrain relocation; site grading and drainage; site accessibility; LEED certification support for stormwater; and construction control for the Health and Leaning Center.

*Completed as employees of Arizona Engineering Company.

NAU Aspen Crossing*

NAU Aspen Crossing*

Our scope included civil engineering and construction phase services for a new residence hall in NAU’s Central Campus. Under contract with NAU’s project architect, we provided water, sewer and reclaimed water utility extensions and connections and grading, drainage and storm drain design.

 

*Completed as employees of Arizona Engineering Company.

Huntington Drive Phase II Improvements*

Huntington Drive Phase II Improvements*

The project was originally planned as a mill and asphalt overlay but the initial geotechnical investigation revealed poor sub-grade. A drainage design report and flooding inundation maps were presented to the City for comparison of scope alternatives. The scope was revised to include design of an underground storm drain system and full street reconstruction.

*Completed as employees of Arizona Engineering Company.

Coconino High School*

Coconino High School*

The project included Design of an NFHS (National Federation of State High School Associations) 400 m certified track and field for use as a multi-school sporting event venue. The biggest challenge was providing stormwater attenuation from a significant watershed on a significant slope. The final design, coordinated with the City’s Stormwater Division, included a series of detention ponds, trapezoidal channels and underground structures.

*Completed as employees of Arizona Engineering Company.

Other Sites*

Other Sites*

  • Trinity Lutheran Church & School, Avondale
  • NAIPTA Verde Valley Transit Facility
  • Coconino Community College 4th Street Parking Improvements
  • City of Flagstaff Fire Training Facility
  • NAU Conference Center Site Analysis
  • NAU Health & Learning Center
  • NAU Applied Research & Development LEED Certification
  • NAU Faculty & Staff Housing Analysis

*Completed as employees of Arizona Engineering Company.

Other Construction*

  • NAU Residence Life
  • City of Holbrook
  • NAU Central Campus Reclaimed Waterline Extension
  • Trinity Lutheran Church & School, Avondale
  • Spring Creek Ranch Phase 1, Page Springs
  • Coconino Community College Lone Tree Reclaimed Waterline Extension
  • Red Mesa USD Red Valley/Cove High School Site Improvements
  • Tuba City USD #15 Wagon Trail Elementary School
  • Tuba City USD #15 East Fir Avenue
  • Tuba City USD #15 Alternative Education Center Site Improvements
  • Town of Clarkdale Downtown Enhancements (ADOT)

*Completed as employees of Arizona Engineering Company.

Other Utilities*

  • NAU Central Campus Reclaimed Waterline
  • City of Flagstaff Reach B & D Reclaimed Waterline Extensions
  • City of Flagstaff Talkington Waterline Replacement
  • City of Flagstaff Agassiz/Dupont/Verde Waterline Replacements
  • City of Flagstaff Sunnyside Phases III & IV Improvements
  • NAU Family Housing Cable Improvements
  • NAU Aspen Crossing Site Improvements
  • NAU Runke Drive Reclaimed Waterline Extension
  • City of Holbrook Sewer Replacements
  • Holbrook USD, George Gardner Performing Arts Center
  • NAIPTA Verde Valley Transit Facility
  • Trinity Lutheran Church and School, Avondale
  • Red Mesa USD, Red Valley/Cove High School Improvements

*Completed as employees of Arizona Engineering Company.

Other Roads*

  • Shumway Road, Navajo County
  • City of Flagstaff Sunnyside Improvements Phases III, IV & V
  • NAIPTA Verde Valley Transit Facility
  • Flagstaff USD, Flagstaff Middle School Access Loop
  • Flagstaff USD, Sechrist Elementary School Pick-Up & Drop-Off

*Completed as employees of Arizona Engineering Company.

Other Fields*

  • Flagstaff High School Athletic Field
  • Mesa Public Schools Carson-Westwood Junior High School Fields
  • NAU Recreation Fields GMP Review

*Completed as employees of Arizona Engineering Company.